The Wilton Integrated Servicing Program (WISP), delivered for Sydney Water, is a major infrastructure project supporting the long-term development of Sydney’s south-west growth corridor. Located in Wilton, NSW, the program enables essential drinking water, recycled water, and wastewater servicing required for up to 15,000 future homes by 2047.
The project addresses critical infrastructure constraints that have delayed residential development in the region, making it a key enabler for future housing supply.
Damos was engaged across multiple delivery packages to manufacture and supply HDPE pipework and fittings supporting the staged delivery of this essential infrastructure.
Damos supplied a total of 17.495 kilometres of HDPE pipeline, along with associated fittings and fabricated components, across multiple project packages:
The project required detailed delivery coordination due to constrained laydown areas and multiple active work fronts. Damos supported installation through:
Damos supported the successful execution of the project through the following key contributions:
The project has progressed successfully, with multiple packages delivered on schedule and remaining works ongoing. Damos’ coordinated manufacturing, fabrication, and logistics approach enabled the reliable delivery of critical water infrastructure, supporting the long-term growth and development of the Wilton region.